I have been trying to get this figured out for hours. Nothing seems to be working. How can I unset a set precision?
the data that is being output looks like this and it is screwing me up:
Customer: Too Hot Joe
Address: 187 Desert Lane
Pool Dimensions: 15 ft. x 30 ft. x (8 to 12) ft. deep
Pool Volume: 4500 Cubic Feet
Wall Surface: 1350 Square Feet
Backhoe Required: Arnold Super-Duper Backhoe
Backhoe Hours: 13 Hours
Equipment Cost: $ 7345.00
Operator Labor: $ 995.15
Tile Crew Hours 9.31
Tile Crew Cost: $ 837.93
Total Labor: $ 1833.08
Total Equipment and Labor $ 9178.08
Customer: Cool Dude
Address: 2468 Appreciate Drive
Pool Dimensions: 25.00 ft. x 25.00 ft. x (3.00 to 5.00) ft. deep
Pool Volume: 2500.00 Cubic Feet
Wall Surface: 1025.00 Square Feet
Backhoe Required: Teeny-Weenie Backhoe
Backhoe Hours: 25.00 Hours
Equipment Cost: $ 1125.00
Operator Labor: $ 668.75
Tile Crew Hours 4.00
Tile Crew Cost: $ 440.00
Total Labor: $ 1108.75
Total Equipment and Labor $ 2233.75
Customer: Hydro Electra
Address: 1776 Revolution Blvd.
Pool Dimensions: 20.00 ft. x 40.00 ft. x (3.00 to 16.00) ft. deep
Pool Volume: 7600.00 Cubic Feet
Wall Surface: 1940.00 Square Feet
Backhoe Required: Arnold Super-Duper Backhoe
Backhoe Hours: 22.00 Hours
Equipment Cost: $ 12430.00
Operator Labor: $ 1684.10
Tile Crew Hours 13.38
Tile Crew Cost: $ 1204.14
Total Labor: $ 2888.24
Total Equipment and Labor $ 15318.24
Error. The Data as follows:
Ilike Swimming
100 East Lower Road
16.0045.005.0010.00
H
Provided an invalid Tile Code
Customer: Ilike Swimming
Address: 100 East Lower Road
Pool Dimensions: 16.00 ft. x 45.00 ft. x (5.00 to 10.00) ft. deep
Pool Volume: 5400.00 Cubic Feet
Wall Surface: 1635.00 Square Feet
Backhoe Required: Macho-Mover Backhoe
Backhoe Hours: 27.00 Hours
Equipment Cost: $ 5400.00
Operator Labor: $ 1255.50
Tile Crew Hours 13.38
Tile Crew Cost: $ 1204.14
Total Labor: $ 2459.64
Total Equipment and Labor $ 7859.64
Error. The Data as follows:
Canine Paddler
9 Kay Road
12.0030.004.0018.00
E
Specified a maximum pool depth which is too deep.
Customer: Canine Paddler
Address: 9 Kay Road
Pool Dimensions: 12.00 ft. x 30.00 ft. x (4.00 to 18.00) ft. deep
Pool Volume: 3960.00 Cubic Feet
Wall Surface: 1284.00 Square Feet
Backhoe Required: Macho-Mover Backhoe
Backhoe Hours: 27.00 Hours
Equipment Cost: $ 5400.00
Operator Labor: $ 1255.50
Tile Crew Hours 5.00
Tile Crew Cost: $ 550.00
Total Labor: $ 1805.50
Total Equipment and Labor $ 7205.50
Customer: Arbor Springs
Address: 4 Reliefcall St.
Pool Dimensions: 20.00 ft. x 35.00 ft. x (3.00 to 6.00) ft. deep
Pool Volume: 3150.00 Cubic Feet
Wall Surface: 1195.00 Square Feet
Backhoe Required: Teeny-Weenie Backhoe
Backhoe Hours: 32.00 Hours
Equipment Cost: $ 1440.00
Operator Labor: $ 856.00
Tile Crew Hours 8.24
Tile Crew Cost: $ 741.72
Total Labor: $ 1597.72
Total Equipment and Labor $ 3037.72
Customer:
Address: 4 Reliefcall St.
Pool Dimensions: 20.00 ft. x 35.00 ft. x (3.00 to 6.00) ft. deep
Pool Volume: 3150.00 Cubic Feet
Wall Surface: 1195.00 Square Feet
Backhoe Required: Teeny-Weenie Backhoe
Backhoe Hours: 32.00 Hours
Equipment Cost: $ 1440.00
Operator Labor: $ 856.00
Tile Crew Hours 8.24
Tile Crew Cost: $ 741.72
Total Labor: $ 1597.72
Total Equipment and Labor $ 3037.72
Press any key to continue . . .
so yeah, this is due in 8 hours and I am desperate
I've decided to just go with a "so what" solution. I am just going to not set precision at all. If the instructor doesn't like the fact that the price isn't going to be shown as "$ 134.50" and instead is "$ 134.5" well that is just too bad. Better to have 1 point deducted for that than have 3 point deducted for that other ugly mess.
If anyone can help me, it will still be appreciated. This will drive me crazy.